Start Project “Protected Home TOGETHER” has two phases of realization:

The first phase includes preparation of architectural engineering design and construction as well as acquiring an Occupation Permit and the second – ensuring the social activity of the protected home for a minimal period of 10 years.

On 25.09.2006 municipality Bojurishte granted to the Foundation “Protected Home TOGETHER” construction rights together with the right to use the building for a time period of 12 years (2 for building and 10 for realization of the social part of the project) and an agreement was reached that Construction has to be finished by September 2008, when the second phase should start.
On 25.04.2007 the ground breaking ceremony took place in the presence of adherents and contributors.